View Single Post
Old 9th July 2007, 08:11 AM   #83 (permalink)
TreeCo
Mature tree
 
Join Date: Jan 2007
Location: Georgia, USA
Posts: 267
Default

Thanks for keeping the ball rolling in this thread TM. My wife and I were correcting a bad lean the top of a red oak developed after a pine top landed in it during an ice storm several years ago. We are tieing it back to other larger trees.

Looking up at our work afterwards I realized just how much of a labor saver total SRT tree work is going to be.

Atached is a system used in the ISA TCC in Nashville in 2005 by Mark Chisholm.

Access is SRT but a complete DdRT system hangs off of the SRT line. The SRT line is over a crotch and tied off to a tree on the ground so it can be pulled down afterwards. The block in the photo rachets.



Dan
TreeCo is offline   Reply With Quote