Quote:
Originally Posted by Ekka How long do you reckon it would take to bring that monster gummy down? Must have 100' spread at least on it beside the multiple leaders. |
Eric
By the end of the second day we should have all the branches back to the main limbs, there's alot of wood thats needs lowering and cutting.The next day would be timber time, by this time there would be a mountain of timber, total of 4-5 days to have it on the ground with a good crew and equip.Then move all the wood, no thanks (crane job). That Stump would take a good day, may be 2 (moving the mulch out of the way) with 2 grinders thats for sure!!!!.Then weather comes in to play, it would be 1 big week


.