Quote:
Originally Posted by jim1nz Yea true, but if this is the case then why dont you install static systems lower in the tree? (1/3 up the canopy from the split) This allows movement in the canopy plus support of the weak union. I do realise this multiplys the forces on the cable though. |
I think installing it lower on it's own could lead to whiplash and that point becoming the place it breaks. However installing a dynamic further up would eliminate that risk a lot.