No, no will rig the nut clusters down seperately, would like to crane the whole darn palm out after that but service lines and street lines in the way on the outside of the unit. Thinking I'll send all the fronds (there is a lot of fronds) down and have them laid on the paving (no foams) then VSL the porcupine down onto them, then VSL all the blocks too.
SF |