Quote:
Originally Posted by Ace Master Well done RC1
l love the crane work, she rained all day?how heavy was that last lift 2.5-3ton? |
Yeah it rained on and off for the branches and then chucked it down throughout the time were on the timber. Still, the site was left imaculate.
That last lift was about 5.5 tons, beech is heavy, about 150 years that one.
shaggs, the buzzer was the overload alarm, it had been randomly going on and off all day. We were well within the lift capacity for that last chunk.