Re: lowering BIG blocks. I quoted it, the job will take all day, 7am till 5am on site. based on these hours and my rate for 3 men plus the additional for the nature of the job and that's how i came up with the price.
the methods i contemplated from the start were blocking down or lowering.
i like the idea of a crane, i've never worked with a crane or even seen one in action. i'm a bit weary of using one to remove large sections without having had any experience with them. i have heard of them being being very effecient though, would be something i'd like to involved with in the future.
how much would a 35m crane be worth per hour? |